As you know, we built a new yurt up at my yurt camp to house the shower and bath tub. I decided a long time ago, to go with Surely Yurts for a small 10 footer custom made by Steve Reed. He and Ray (pictured below) constructed it by hand. We started building on August 22nd and here was the location:
Attachment 658 Attachment 659 Attachment 660 Attachment 661 |
Re: The Bath Yurt
6 Attachment(s)
With a little help from Cooper the dog, we got started on the platform. I say "we", when I actually mean Ray and Steve. I didn't really help all that much in the building other than carry a few things and making sure we had enough supplies and hops to get the job done:
Attachment 662 Attachment 663 Attachment 664 Attachment 665 Attachment 666 At this point, I started building beer brats because we all know you can't build a yurt without them. :) Attachment 667 |
Re: The Bath Yurt
6 Attachment(s)
The platform work went pretty quick actually. They leveled everything off of a big slab of granite in the center. Unfortunately for us, it was right near a yellowjackets nest, but we didn't bother them and they didn't bother us, at least for a while:
Attachment 668 Attachment 669 Attachment 670 Attachment 671 Attachment 672 Attachment 673 |
Re: The Bath Yurt
1 Attachment(s)
Here Steve explains the install so far:
|
Re: The Bath Yurt
14 Attachment(s)
Here they are finishing off the platform and ending the day.
Attachment 675 Attachment 676 Attachment 677 Attachment 678 Attachment 679 Attachment 680 Attachment 681 Attachment 682 Attachment 683 Attachment 684 Attachment 685 Attachment 686 Attachment 687 Attachment 688 |
Re: The Bath Yurt
1 Attachment(s)
On day two, after a well needed breakfast and gallons of water, we got started on actually putting up the yurt.
|
Re: The Bath Yurt
8 Attachment(s)
Now we have the frame up:
Attachment 690 Attachment 691 Attachment 692 Attachment 693 Attachment 694 Attachment 695 Attachment 696 Attachment 697 |
Re: The Bath Yurt
10 Attachment(s)
The roof and the wall fabric:
Attachment 698 Attachment 699 Attachment 700 Attachment 701 Attachment 702 Attachment 703 Attachment 704 Attachment 705 Attachment 706 Attachment 707 |
Re: The Bath Yurt
1 Attachment(s)
Wrapup video.
|
Re: The Bath Yurt
3 Attachment(s)
Here is what we had at the end:
Attachment 711 Attachment 710 Followed by chicken grilled on the campfire. :) Attachment 709 |
Re: The Bath Yurt
2 Attachment(s)
|
Re: The Bath Yurt
Wow, we had a great time at the camp over the weekend! Love what you've done with that bath tub and the rainwater catch.
Thanks for everything Jeff. See you soon. -Cheers |
Re: The Bath Yurt
Very nice indeed.
|
Re: The Bath Yurt
Jafo,
- really like the roof/ crown! I have been looking for ways to put the stove in the center/ piped through the crown, without loosing light intake from above. I think you solved my problem. Any thoughts on the structural change compared to normal straight raters. Ie.- How would this translate to a 20 or 30 foot yurt? - what's the subfloor? Kind of looks like Advantek but looking at it on my phone isnt the best. |
Re: The Bath Yurt
I can't speak to the design as I didn't build it. There wasn't anything special on the subfloor, just some strand and then a layer of insulation (see video) and then larch flooring on top.
|